East Point New Bridge

Location: Palm Beach gardens, Fl

Facility: Pump House

Construction Type: Reroofing & Structural Renovation

Project Description

As part of East Pointe Country Club’s comprehensive course renovation project, upgrading their irrigation infrastructure became a critical priority. The club needed to install a new pump station to support their enhanced irrigation requirements and selected Roughneck Ranch to perform the necessary structural modifications and reroofing to accommodate this vital equipment.
Our team’s assessment of the existing pump house revealed significant challenges that needed to be addressed before the new pump station could be installed. The structural integrity of the building had been compromised by years of exposure to moisture and humidity typical of pump house environments.
East Point new wooden footbridge over pond with fountain on golf course

East Pointe New Bridge Photos

The scope of our work included:

ccIcon
Complete removal of the deteriorated roofing system
ccIcon1
Replacement of all roof sheathing due to extensive water damage discovered during demolition
ccIcon2
Structural repairs to multiple damaged trusses throughout the building
ccIcon3
Engineering and reinforcement of the trusses surrounding the hatch opening
ccIcon4
Expansion of the existing hatch opening to align with the wet well dimensions
ccIcon5
Implementation of comprehensive waterproofing measures throughout the structure
The expanded hatch opening was specifically designed to facilitate both the initial installation of the new pumps and motors and to ensure ease of access for future maintenance and servicing requirements. This forward-thinking approach will significantly reduce maintenance costs and equipment downtime in the coming years.
With our structural and roofing renovations complete, the pump house is now properly prepared to house the new pump station. The reinforced structure and waterproofing measures will ensure the longevity of both the building and the expensive equipment it will contain, providing East Pointe Country Club with a reliable irrigation solution for their newly renovated course.
East Point new wood plank bridge walkway over water between fairways

Frequently Asked Questions

What services does Roughneck Ranch offer?

End-to-end golf course maintenance facility construction across Florida, including complete facility builds, concrete, custom steel buildings, wash racks, cart storage, pump houses, and licensed electrical and plumbing.

Based in West Palm Beach, FL, serving golf courses throughout the state.

Family-owned and licensed, specializing exclusively in golf course maintenance facilities with in-house construction, electrical, and plumbing — so one team handles the entire project.

Yes — projects of all sizes, from new construction to renovations and structural upgrades.

Wash stations, chemical mixing areas, and full-system designs built for the demands of golf course maintenance operations.

Contact Us Today to discuss your golf course facility needs.

image17